Heartland Dental Pittsburgh - 6521 Steubenville Pike

Interior Buildout of an Existing Shell Building We anticipate Starting Construction on or before 02/16/2025 Demo, Concrete SOG, Structural Concrete, Steel Stud Framing, Blocking, Drywall, Interior Paint, Wall covering, Flooring, Tile, Doors and Hardware, ACT gride and ceiling systems, EIFS, Mansory, Plumbing, HAVC, Electrical, Fire sprinkler & Fire Alarm
Bid Set (click to expand/collapse)