Heartland Dental Pittsburgh - 6521 Steubenville Pike
Interior Buildout of an Existing Shell Building We anticipate Starting Construction on or before 02/16/2025 Demo, Concrete SOG, Structural Concrete, Steel Stud Framing, Blocking, Drywall, Interior Paint, Wall covering, Flooring, Tile, Doors and Hardware, ACT gride and ceiling systems, EIFS, Mansory, Plumbing, HAVC, Electrical, Fire sprinkler & Fire Alarm
Status
Accepting Bids
| Bid Date | 1/5/26 5:00pm |
Location
6521 Steubenville Pike Pittsburgh, PA 15205


