Commonwealth Charter Academy - Bethlehem
Project cost range is anticipated to be under $15,000,000.
Addendum #1
(click to expand/collapse)
(click to expand/collapse)
Addendum #2
(click to expand/collapse)
(click to expand/collapse)
| Name | Size | ||
| 000002 TOC ADN 02 | 204.0 KB | ||
| 024119 Selective Demolition ADN 02 | 112.9 KB | ||
| 25.10.31 Addendum #2 Narrative | 165.6 KB | ||
| 25.10.31 Bidder Contact List | 147.1 KB |
Addendum #3
(click to expand/collapse)
(click to expand/collapse)
| Name | Size | ||
| 000002 TOC ADN 03 | 197.9 KB | ||
| 000003 Drawing List ADN 03 | 120.4 KB | ||
| 013300 Submittal Procedures ADN 03 | 247.4 KB | ||
| 103100 Manufactured Gas Fireplaces ADN 03 | 82.3 KB | ||
| 113013 Residential Appliances ADN 03 | 90.7 KB | ||
| 321313 Concrete Pavement Stahl ADN 03 | 162.2 KB | ||
| Addendum 3 Narrative | 192.3 KB | ||
| G1.01 Drawing Index | 186.0 KB | ||
| S0.01 - STRUCTURAL NOTES, ABBREVIATIONS, SYMBOLS AND SCHEDULES | 320.9 KB | ||
| S2.01 - FOUNDATION TYPICAL DETAILS | 770.2 KB |
Addendum #4
(click to expand/collapse)
(click to expand/collapse)


